• Blast Furnace Stack Repair at Severstahl Piombino


  • Chaoyang China, Hearth Refractory Installation (Graftech)
  • Design, Supply and Repairs of Taphole at SSAB #2BF
  • Developing a Modular Repair Package for Coke Batteries which would be marketed on a Global Basis. The initial project was secured at Corus Steel IJmuiden
  • Arcelor Mittal Bremen, BF#3 reline including 3 Stoves, Hot Blast Main, Bustle Pipe and Heat up services.


  • Ilva Taranto, BF#4 reline including troughs. Reline Ilva Taranto BF#2.Hearth refurbishment & Stoves repair, including engineering Gunning the Stack Ilva Taranto BF#4, 400 tonnes
  • Reline Carsid Charleroi Belgium BF#6. HB system & Hearth refurbishment including engineering. Emergency repair Tap hole Carsid Belgium BF#A
  • Corus IJmuiden, Deck repair Cokes Oven 2 Battery 21, 22 and 23.
    Corus IJmuiden, Cokes Battery technical advisement and supervision& Deck repair Cokes Oven 2 Battery 24.


  • Mittal Arcelor, #3 BF Dunkerque, New Hearth Refractories
  • Emergency repair Tap hole Carsid Belgium BF#A.
  • BF #7 Corus IJmuiden
    Reline Blast Furnace #7, the Netherlands
    Hot Blast Main, replacement
    Bustle Pipe, replacement
    PW top, replacement
    Hearth and Cast house refurbishment
  • Posco, South Korea, Cross Over, Core Drilling, Salamander Tap
  • Nanjing Blast Furnace #2, Furnace Installation (Graftech)


  • Blast Furnace 13 Gary, Reline Blast Furnace & Hot Blast System
  • Taiyuan Blast Furnace #3, Supervision (Graftech)
    Benxi, Blast Furnace #7, Supervision (Graftech)
    Blast Furnace #3, Stoves, Benxi, China, relocation Blast Furnace
  • Posco, South Korea, supervision
    Posco Steel, Kwangyang, South Korea, BF #1 and BF #2, installation of Cross Over between the domes (Improved Koppers Design);
  • Salzgitter BF “A”, in Salzgitter, Installation of the Hot Blast Main, Mixing Chamber, Stack and Bustle Pipe. Working schedule of 20 days, realisation in 18 days. No accidents and incidents on 17.000 men hours.


  • Benxi, Iron& Steel, Sublance system
    Jinan, Iron and Steel, Sublance system
    Blast Furnace #6 Benxi, Iron& Steel, China, Hearth installation
    Taigang Steel, China, BF #2, installation of one new stove (Corus Design)
    Tangshan Steel, China, BF#4, installation of one new stove (Corus Design)
    Wugang Group Wuhan China, installation of 3 new burners in hot blast stoves BF#7


  • China Steel, Kaoshung, Taiwan, Coke Battery Revamp Project
  • Salzgitter Stahl AG, Installation of new carbon hearth Blast Furnace “B”
  • Arcelor, Cockerill Ougree
  • ILVA Taranto - Installation of new bosh & tuyere belt Blast Furnace


  • Sidmar Blast Furnace, Gent Belgium, Installation of new carbon hearth Blast Furnace "A"
  • Bayuquan Blast Furnace #1+2 Anshan Steel, China, BF #11, installation of Ceramic Burner and dome (Corus Design)


  • Corus IJmuiden, Reline of Blast Furnace #6, demolition hearth, mechanical repairs, hearth & bosh refractory installation. Jan Soonius was Project Director for the total construction package (demo/mech/refr/cooling). Total project duration 58 days.
  • Sidmar,Supervision Sidmar Blast Furnace "B", installation ceramic tiles dust catcher.
  • Anshan Steel, China, BF #1, installation of three new stoves (Corus Design)
    Shougang Steel, China, BF #3, installation of three new stoves (Corus Design)


  • Wugang Group Wuhan China, installation of 3 new stoves Blast Furnace #1


  • VSZ #3 Furnace Reline
  • Aldel Gas Treatment Centre, Delfzijl
  • Piombino #4 Furnace Reline


  • Krupp Dortmund, Tap hole Repairs


  • Tanggang Steel Tangshan China, installation of refractories 3 new stoves


  • Hoogovens Ijmuiden, End Flue and Through Wall Repairs, Coke Plant #2
    Shell Pernis Rozenburg, Per+ Project.


  • BHP Australia, Consultancy, Coke Battery Repairs
  • Kemira Rozenburg, Consultancy, Fertilizing Plant
    AVI West, Construction Consultant, Incinerator Plant
  • Algoma Steel, SS Marie, Through Wall Construction


  • Armco Middletown, Reline Hot Blast Stove #2
  • Ilva Taranto, Reline Hot Blast Stoves at #2 Blast Furnace.
  • AVR Rijnmond, Construction Consultant, Incinerator Plant
    Hoogovens Ijmuiden:
    Reline Pusher Furnace #21 and #22
    Reline #7 Blast Furnace including major repairs on the Hot Blast System.
    General Maintenance Refractories
    Intermediate Repair #7 Blast Furnace
    Repair of #1 Coke Plant, Battery 16
    Buck Stay and End Flue Repairs, #2 Coke Plant
    Relines Pusher Furnace 21-24
    Renovation #6 Blast Furnace, Stoves #3 and #4